1 00:00:00,720 --> 00:00:17,500 [Music] 2 00:00:23,570 --> 00:00:20,240 Saturn five film report number twenty 3 00:00:28,099 --> 00:00:23,580 covers progress area December first 1967 4 00:00:29,570 --> 00:00:28,109 through February 29th 1968 at the 5 00:00:31,939 --> 00:00:29,580 beginning of the quarter the second 6 00:00:33,709 --> 00:00:31,949 Saturn 5 flight vehicle stood fully 7 00:00:36,110 --> 00:00:33,719 erected in the Kennedy Space Center's 8 00:00:37,880 --> 00:00:36,120 Vehicle Assembly Building with checkout 9 00:00:38,630 --> 00:00:37,890 underway for a scheduled launch next 10 00:00:41,569 --> 00:00:38,640 quarter 11 00:00:42,950 --> 00:00:41,579 check out of the AS 502 which was 12 00:00:45,410 --> 00:00:42,960 developed under direction of the 13 00:00:47,779 --> 00:00:45,420 Marshall Space Flight Center proceeded 14 00:00:51,139 --> 00:00:47,789 throughout December in January with no 15 00:00:53,660 --> 00:00:51,149 major problems encountered AAS 502 will 16 00:00:56,119 --> 00:00:53,670 serve as launch vehicle for the Apollo 6 17 00:01:00,220 --> 00:00:56,129 mission an unmanned flight to qualify 18 00:01:03,290 --> 00:01:00,230 the Saturn 5 for future manned flights 19 00:01:05,149 --> 00:01:03,300 roll out of the 36 story tall space 20 00:01:08,660 --> 00:01:05,159 vehicle from the Assembly Building to 21 00:01:10,130 --> 00:01:08,670 pad a of launch complex 39 was 22 00:01:13,550 --> 00:01:10,140 accomplished without incident on 23 00:01:15,620 --> 00:01:13,560 February 6th the rollout operation the 24 00:01:18,410 --> 00:01:15,630 three-mile movement requiring some seven 25 00:01:20,570 --> 00:01:18,420 hours twice a s 502 in the launch 26 00:01:23,630 --> 00:01:20,580 position from which its predecessor a s 27 00:01:27,440 --> 00:01:23,640 501 began its successful flight last 28 00:01:30,039 --> 00:01:27,450 November 9th the 502 mission will be 29 00:01:31,999 --> 00:01:30,049 essentially the same as that of the 501 30 00:01:35,420 --> 00:01:32,009 evaluation of launch vehicle and 31 00:01:37,219 --> 00:01:35,430 spacecraft performance a s 502 will 32 00:01:39,770 --> 00:01:37,229 carry several minor modifications 33 00:01:42,109 --> 00:01:39,780 directed by the Marshall Center as a 34 00:01:46,550 --> 00:01:42,119 result of data provided by the initial 35 00:01:48,499 --> 00:01:46,560 launch final updated versions of both 36 00:01:50,060 --> 00:01:48,509 the flight and ground program tapes for 37 00:01:52,880 --> 00:01:50,070 the computerized countdown and launch 38 00:01:57,499 --> 00:01:52,890 were delivered to KSC by the Marshall 39 00:02:00,050 --> 00:01:57,509 Center in early February during the 40 00:02:03,080 --> 00:02:00,060 10-hour earth orbital Apollo 6 mission a 41 00:02:05,330 --> 00:02:03,090 five and a half minute s4b stage second 42 00:02:08,089 --> 00:02:05,340 burn will duplicate that of an actual 43 00:02:10,910 --> 00:02:08,099 lunar mission however the Apollo 44 00:02:13,850 --> 00:02:10,920 spacecraft after separation from the s4b 45 00:02:16,850 --> 00:02:13,860 stage will be limited to an Apogee 46 00:02:19,840 --> 00:02:16,860 12,000 nautical miles by a 4-minute 47 00:02:22,670 --> 00:02:19,850 braking burn of its propulsion system 48 00:02:24,710 --> 00:02:22,680 from its Apogee the spacecraft will 49 00:02:26,870 --> 00:02:24,720 simulate lunar mission return flight 50 00:02:30,590 --> 00:02:26,880 maneuvers including a high-speed 51 00:02:33,800 --> 00:02:30,600 re-entry into Earth's atmosphere the s4b 52 00:02:37,040 --> 00:02:33,810 stage will travel about 270 9,000 miles 53 00:02:40,430 --> 00:02:37,050 into space on a 16 day elliptical Earth 54 00:02:43,310 --> 00:02:40,440 orbit due to the moon's position at 5:02 55 00:02:48,470 --> 00:02:43,320 launch the stage will not actually swing 56 00:02:51,680 --> 00:02:48,480 around the moon as a s5o - moved closer 57 00:02:54,680 --> 00:02:51,690 to its launch date all elements of the 58 00:02:57,290 --> 00:02:54,690 third Saturn 5 flight vehicle a s 503 59 00:03:00,880 --> 00:02:57,300 were delivered to KSC from the prime 60 00:03:05,030 --> 00:03:00,890 contractors the vehicles first stage s1 61 00:03:10,580 --> 00:03:05,040 c3 arrived December 27 from Boeing the 62 00:03:12,970 --> 00:03:10,590 shoe in New Orleans the second stage s2 63 00:03:15,590 --> 00:03:12,980 3 was received on December 24th 64 00:03:18,680 --> 00:03:15,600 following acceptance firing at Marshalls 65 00:03:20,300 --> 00:03:18,690 Mississippi test facility the stage was 66 00:03:23,170 --> 00:03:20,310 built for North American rock wall at 67 00:03:27,380 --> 00:03:23,180 seal Beach California 68 00:03:29,600 --> 00:03:27,390 the third stage s for B 503 arrived by 69 00:03:32,030 --> 00:03:29,610 super guppy aircraft on December 30th 70 00:03:36,140 --> 00:03:32,040 from the McDonnell Douglas Sacramento 71 00:03:37,910 --> 00:03:36,150 Test Site in California the instrument 72 00:03:40,910 --> 00:03:37,920 unit for the third Saturn 5 flight 73 00:03:43,610 --> 00:03:40,920 vehicle was delivered to KSC on January 74 00:03:48,770 --> 00:03:43,620 4th by super guppy from the contractor 75 00:03:51,259 --> 00:03:48,780 IBM Huntsville after inspection and 76 00:03:53,360 --> 00:03:51,269 check-out of the stages an IU stacking 77 00:03:55,370 --> 00:03:53,370 of the a s 503 in the Vehicle Assembly 78 00:03:58,580 --> 00:03:55,380 Building was accomplished by the 1st of 79 00:04:01,039 --> 00:03:58,590 February topped by a mock-up of the 80 00:04:03,170 --> 00:04:01,049 Apollo spacecraft the vehicle will 81 00:04:04,970 --> 00:04:03,180 undergo extensive checkout before being 82 00:04:08,240 --> 00:04:04,980 pronounced ready for flight scheduled 83 00:04:09,410 --> 00:04:08,250 later this year the dummy spacecraft 84 00:04:12,199 --> 00:04:09,420 structure built by North American 85 00:04:15,080 --> 00:04:12,209 Rockwell was modified and prepared for 86 00:04:17,539 --> 00:04:15,090 flight use by the Marshall Center the 87 00:04:20,630 --> 00:04:17,549 boilerplate structure designated BP 30 88 00:04:23,540 --> 00:04:20,640 will be ballasted 289 thousand pounds 89 00:04:25,460 --> 00:04:23,550 for the 503 flight since the manned 90 00:04:27,560 --> 00:04:25,470 spacecraft Center in Houston has no 91 00:04:30,860 --> 00:04:27,570 mission requirements for the young man a 92 00:04:33,050 --> 00:04:30,870 5:03 BP 35 Marshall will have 93 00:04:38,300 --> 00:04:33,060 responsibility for the entire space 94 00:04:40,640 --> 00:04:38,310 vehicle s1c for the first stage for the 95 00:04:42,590 --> 00:04:40,650 fourth Saturn five flight vehicle was 96 00:04:44,390 --> 00:04:42,600 moved in late December from storage in 97 00:04:47,180 --> 00:04:44,400 the manufacturing building at Boeing the 98 00:04:49,580 --> 00:04:47,190 shoo-in to test cell number one of the 99 00:04:52,430 --> 00:04:49,590 stage test building for incorporation of 100 00:04:57,860 --> 00:04:52,440 modifications delivery of the stage to 101 00:04:59,420 --> 00:04:57,870 KSC is due in late April the first stage 102 00:05:01,790 --> 00:04:59,430 for the fifth flight vehicle is in 103 00:05:05,020 --> 00:05:01,800 storage at Boeing masu with delivery to 104 00:05:07,970 --> 00:05:05,030 KSC slated for June 105 00:05:10,370 --> 00:05:07,980 the second rs to stage four the fourth 106 00:05:13,370 --> 00:05:10,380 flight vehicle was successfully captive 107 00:05:15,500 --> 00:05:13,380 fired at MTF on February 10th for its 108 00:05:18,230 --> 00:05:15,510 full duration of six minutes to meet 109 00:05:20,810 --> 00:05:18,240 acceptance test requirements an earlier 110 00:05:24,050 --> 00:05:20,820 attempt on January 30th had been 111 00:05:25,030 --> 00:05:24,060 terminated 17 seconds after ignition due 112 00:05:27,020 --> 00:05:25,040 to a ground support equipment 113 00:05:29,210 --> 00:05:27,030 malfunction and the Delta P tank 114 00:05:30,740 --> 00:05:29,220 measurements which resulted in venting 115 00:05:34,330 --> 00:05:30,750 of the liquid oxygen and liquid hydrogen 116 00:05:37,130 --> 00:05:34,340 tanks following the successful firing 117 00:05:43,070 --> 00:05:37,140 s24 is being readied for shipment to KSC 118 00:05:45,500 --> 00:05:43,080 in late april during dye penetrant tests 119 00:05:47,380 --> 00:05:45,510 an x-ray inspection of the s2 stage for 120 00:05:49,700 --> 00:05:47,390 the fifth flight vehicle at Seal Beach 121 00:05:51,800 --> 00:05:49,710 hairline cracks were discovered in the 122 00:05:54,860 --> 00:05:51,810 liquid hydrogen tank circumferential 123 00:05:58,310 --> 00:05:54,870 weld the defective area was grooved out 124 00:06:00,080 --> 00:05:58,320 and REE welded after rigidly inspection 125 00:06:02,360 --> 00:06:00,090 using double angle x-ray and dye 126 00:06:05,180 --> 00:06:02,370 penetrant tests the stage was shipped in 127 00:06:09,080 --> 00:06:05,190 mid-february to MTF for acceptance 128 00:06:11,480 --> 00:06:09,090 firing next quarter the s2 2 stage was 129 00:06:14,990 --> 00:06:11,490 also Rhian spected at KSC prior to 130 00:06:18,410 --> 00:06:15,000 stacking and s 2 3 & 4 were rien spected 131 00:06:22,100 --> 00:06:18,420 at MTF when hairline weld flaws were 132 00:06:23,840 --> 00:06:22,110 also found in the s2 7 stage a decision 133 00:06:27,050 --> 00:06:23,850 was made to initiate an additional 134 00:06:30,740 --> 00:06:27,060 inspection procedure cryogenic proof 135 00:06:34,130 --> 00:06:30,750 testing on all man rated stages starting 136 00:06:37,040 --> 00:06:34,140 with s2 4 however depending on the 137 00:06:39,170 --> 00:06:37,050 success of the as50 to launch if NASA 138 00:06:41,460 --> 00:06:39,180 decides to fly the third vehicle manned 139 00:06:43,860 --> 00:06:41,470 the s2 3 will be unn 140 00:06:46,290 --> 00:06:43,870 sacked and sent back to MTF for the new 141 00:06:50,790 --> 00:06:46,300 test which consists of proof pressure 142 00:06:52,230 --> 00:06:50,800 testing at cryogenic temperatures the 143 00:06:55,590 --> 00:06:52,240 third stage for the fourth flight 144 00:06:57,930 --> 00:06:55,600 vehicle s for B 504 was removed from 145 00:07:00,330 --> 00:06:57,940 storage in early January and installed 146 00:07:02,580 --> 00:07:00,340 in the beta one test stand at SAC tow 147 00:07:04,950 --> 00:07:02,590 for deferred post static checkout which 148 00:07:10,380 --> 00:07:04,960 is now underway the stage will be 149 00:07:13,050 --> 00:07:10,390 delivered to KSC in late April s for B 150 00:07:15,840 --> 00:07:13,060 505 underwent insulation rework in the 151 00:07:17,700 --> 00:07:15,850 vehicle checkout lab at SAC DOE and was 152 00:07:19,560 --> 00:07:17,710 returned to storage after completion of 153 00:07:21,960 --> 00:07:19,570 liquid hydrogen tank inspection in 154 00:07:23,820 --> 00:07:21,970 mid-february the stage will undergo 155 00:07:26,460 --> 00:07:23,830 deferred post static checkout and 156 00:07:31,350 --> 00:07:26,470 modifications in March with delivery to 157 00:07:33,090 --> 00:07:31,360 KSC set for late June the instrument 158 00:07:35,220 --> 00:07:33,100 unit for the fourth flight vehicle was 159 00:07:38,520 --> 00:07:35,230 removed from storage at IBM Huntsville 160 00:07:40,940 --> 00:07:38,530 in early January for retest necessary 161 00:07:43,470 --> 00:07:40,950 after incorporation of modifications 162 00:07:46,260 --> 00:07:43,480 retest was successfully completed in 163 00:07:48,780 --> 00:07:46,270 late January and the IU is in temporary 164 00:07:53,220 --> 00:07:48,790 storage awaiting shipment to KSC in 165 00:07:54,690 --> 00:07:53,230 April component assembly on the 166 00:07:57,060 --> 00:07:54,700 instrument unit for the fifth flight 167 00:07:59,870 --> 00:07:57,070 vehicle began at IBM Huntsville in early 168 00:08:03,719 --> 00:07:59,880 January and was finished by mid February 169 00:08:04,620 --> 00:08:03,729 following checkout delivery of SIU 5:05 170 00:08:09,390 --> 00:08:04,630 to KSC 171 00:08:11,580 --> 00:08:09,400 is scheduled in late June stages and 172 00:08:13,560 --> 00:08:11,590 instrument units for subsequent saturn v 173 00:08:15,930 --> 00:08:13,570 flight vehicles continue in various 174 00:08:18,180 --> 00:08:15,940 phases of fabrication assembly check out 175 00:08:20,610 --> 00:08:18,190 and testing at contractor facilities and 176 00:08:22,500 --> 00:08:20,620 even though the initial flight test of a 177 00:08:24,990 --> 00:08:22,510 saturn v vehicle last quarter was 178 00:08:26,909 --> 00:08:25,000 successful research and development type 179 00:08:29,460 --> 00:08:26,919 tests and investigations are a 180 00:08:31,530 --> 00:08:29,470 continuing necessity to help ensure that 181 00:08:33,779 --> 00:08:31,540 all possible engineering improvements 182 00:08:38,520 --> 00:08:33,789 will be discovered and incorporated in 183 00:08:40,020 --> 00:08:38,530 future vehicles in December a Thor 184 00:08:42,209 --> 00:08:40,030 missile fuel tank which had been 185 00:08:44,970 --> 00:08:42,219 insulated with a spray on foam intended 186 00:08:47,460 --> 00:08:44,980 for use on s2 stages was installed at 187 00:08:50,520 --> 00:08:47,470 the Sacramento Test Site in preparation 188 00:08:52,650 --> 00:08:50,530 for cryogenic tanking tests McDonnell 189 00:08:54,360 --> 00:08:52,660 Douglas has been contracted by NASA to 190 00:08:56,490 --> 00:08:54,370 conduct the test program 191 00:08:59,760 --> 00:08:56,500 for North American Rockwell builders of 192 00:09:01,740 --> 00:08:59,770 the s2 stage purpose of these tests is 193 00:09:04,110 --> 00:09:01,750 to evaluate the new type insulation 194 00:09:06,930 --> 00:09:04,120 material and to verify new insulation 195 00:09:08,490 --> 00:09:06,940 field repair techniques although some 196 00:09:10,769 --> 00:09:08,500 delays have been encountered due to bad 197 00:09:15,480 --> 00:09:10,779 weather testing is expected to be 198 00:09:17,370 --> 00:09:15,490 completed in March a three-part s2 199 00:09:19,710 --> 00:09:17,380 lightweight structure will test program 200 00:09:22,769 --> 00:09:19,720 for major stage segments is underway at 201 00:09:25,230 --> 00:09:22,779 Marshall and Santa Susana California the 202 00:09:27,570 --> 00:09:25,240 a structure made up of s2 for type LOX 203 00:09:30,320 --> 00:09:27,580 tank at skirt and cylinders one and two 204 00:09:33,660 --> 00:09:30,330 is undergoing systems installation than 205 00:09:37,019 --> 00:09:33,670 instrumentation at MSFC in preparation 206 00:09:38,760 --> 00:09:37,029 for structural testing next quarter s2 4 207 00:09:41,640 --> 00:09:38,770 is the first of the lightweight stages 208 00:09:44,370 --> 00:09:41,650 due to thinner propellant tank walls and 209 00:09:46,230 --> 00:09:44,380 lighter structures s2 4 types stages 210 00:09:48,870 --> 00:09:46,240 will weigh about 3,000 pounds less than 211 00:09:51,329 --> 00:09:48,880 earlier stages allowing a comparable 212 00:09:56,880 --> 00:09:51,339 increase in Saturn 5 vehicle payload 213 00:09:58,769 --> 00:09:56,890 capability a new 64 foot tall structural 214 00:10:00,900 --> 00:09:58,779 test tower is under construction at 215 00:10:03,510 --> 00:10:00,910 Marshall for use in testing da structure 216 00:10:07,410 --> 00:10:03,520 the stand is expected to be finished and 217 00:10:09,900 --> 00:10:07,420 ready for operation and April the B 218 00:10:12,060 --> 00:10:09,910 structure consisting of s 2 4 type upper 219 00:10:14,579 --> 00:10:12,070 tank section forward dome and forward 220 00:10:16,980 --> 00:10:14,589 skirt is now undergoing structural 221 00:10:21,540 --> 00:10:16,990 testing at Santa Susana with result 222 00:10:23,850 --> 00:10:21,550 still incomplete testing of the C 223 00:10:26,310 --> 00:10:23,860 structure which includes s2 for type F 224 00:10:29,040 --> 00:10:26,320 skirt thrust cone and center engine beam 225 00:10:31,170 --> 00:10:29,050 is in progress in the load test tower at 226 00:10:34,410 --> 00:10:31,180 Marshall and will continue during the 227 00:10:36,510 --> 00:10:34,420 next report period all phases of the s2 228 00:10:41,060 --> 00:10:36,520 lightweight structural test program are 229 00:10:44,460 --> 00:10:41,070 expected to be completed in September a 230 00:10:46,019 --> 00:10:44,470 series of j2 engine tests now being held 231 00:10:48,810 --> 00:10:46,029 at the Arnold engineering development 232 00:10:51,570 --> 00:10:48,820 center Intelli home Tennessee has two 233 00:10:53,340 --> 00:10:51,580 primary objectives establishment of the 234 00:10:55,260 --> 00:10:53,350 lower bounds for fuel pump Inlet 235 00:10:58,440 --> 00:10:55,270 pressure on the engine in the s2 stage 236 00:11:00,750 --> 00:10:58,450 configuration and verification of the j2 237 00:11:03,870 --> 00:11:00,760 s capability to restart satisfactorily 238 00:11:06,150 --> 00:11:03,880 after an s4 b stage orbital Coast period 239 00:11:07,590 --> 00:11:06,160 of 80 minutes instead of 90 minutes as 240 00:11:09,930 --> 00:11:07,600 presently programmed 241 00:11:12,330 --> 00:11:09,940 test results to date have been positive 242 00:11:17,460 --> 00:11:12,340 but a second engine sample is scheduled 243 00:11:19,620 --> 00:11:17,470 to fully verify these conclusions with 244 00:11:21,870 --> 00:11:19,630 the second Saturn 5 flight vehicle now 245 00:11:23,870 --> 00:11:21,880 on the launch pad the third flight 246 00:11:25,950 --> 00:11:23,880 vehicle erected and in check-out and 247 00:11:28,650 --> 00:11:25,960 assembly and testing of subsequent 248 00:11:30,720 --> 00:11:28,660 vehicles well underway this report 249 00:11:33,480 --> 00:11:30,730 period witnessed continuing progress